, home
Freshly painted white room with a wooden stepladder, a white stool, a potted plant and sunlight through a tall window

Painting the insideand the outside

Interior and exterior painting, with the prep that makes it last.

Painting

Prep first,then the paint

Most of a good paint job happens before the first coat: washing, scraping, patching, caulking, sanding and priming. We do that part properly, protect everything that isn’t getting paint, then cut in clean lines inside and out, with Nareg on site every day to check it.

What’s included04 parts

  • Prep first

    Wash, scrape, patch, caulk and sand before any primer.

  • Everything protected

    Floors, furniture, plants and fixtures covered and taped.

  • Clean lines

    Walls, ceilings, trim and doors cut in straight.

  • Walked at the end

    Every room checked with you before the tape comes off.

In depth

Painting a house,inside and out

When painting needs a permit, the lead-safe rules for homes built before 1978, what Southern California's air rules allow in a can of paint, and the prep behind a clean finish.

Permits and paint

Painting needs no building permit. The California Residential Code and Pasadena's own list of exempt work both name painting, papering, tiling and similar finish work, except along an accessible route. Pasadena adds that some exempt work can still need a zoning permit, and an exemption never allows work that breaks the code.

Historic districts don't control color in Pasadena. In a landmark district, exterior changes visible from the street need a Certificate of Appropriateness, but paint colors and routine maintenance are exempt. If your home is designated, city preservation staff give free advice on things like removing paint from masonry without abrasives. An HOA's rules on color still apply where you have one.

Homes built before 1978

If your house was built before 1978, lead paint changes the job. The EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint in those homes, and in child-occupied buildings of the same age. The firm doing it has to be certified, sole proprietors included, and the rule sets out what the household must be told before work starts.

The rule exempts small jobs: 6 square feet or less of disturbed paint per room inside, or 20 square feet or less outside. Window replacement and demolition of painted surfaces are always covered. It doesn't apply when a certified inspector or risk assessor finds the paint lead-free, or when a certified renovator clears specific parts with an EPA-recognized test kit or a lab sample.

On a covered job, LA County Public Health lists the work practices:

  • Contain the area with plastic sheeting and tape, seal doors and vents, and cover the ground outside.
  • Don't burn or torch paint, don't sand or grind with power tools that lack a shroud and HEPA vacuum, and keep heat guns under 1100°F.
  • Keep dust down by misting before scraping and scoring paint before pulling parts apart.
  • Clean up daily, then finish with a HEPA vacuum and a wet wipe and mop before the plastic comes down.

California certifies workers for lead-related construction through training from CDPH-accredited providers.

What goes into the can

CALGreen limits the volatile organic compounds (VOC) in architectural paint, unless a local air district sets lower limits. Its table allows 50 grams per liter for flat paint and 100 for nonflat. The South Coast Air Quality Management District's Rule 1113, which governs paint sold and applied in its district, sets nonflat coatings at 50 grams per liter, half the CALGreen figure. Pasadena's checklists also hold caulks, sealants and adhesives to CALGreen's VOC limits. Parts of our 100-mile area sit in other air districts with their own rules.

The prep behind the finish

Prep comes before any paint. Inside, that means moving and covering furniture, filling holes and cracks, sanding patches smooth, priming bare spots, caulking trim and masking edges. Outside, it means washing the walls, scraping loose paint, fixing rotted wood and cracked stucco, priming bare wood and patched areas, and caulking joints around windows and trim. On a house built before 1978, all of that follows the lead-safe practices above.

What to have ready, and what moves time and cost

Tell us the rooms or walls, the year the house was built, any colors you have in mind, and whether there's an HOA. Cost and time move with the area and the height (two stories mean ladders or scaffolding), how much prep the surfaces need, big color changes that take extra coats, doors, trim and cabinets, lead-safe containment on an older home, and the weather for exterior work. Nareg Kabaian supervises the job on site every day, and you can call or text him at any hour.

Sources

How a job runs

Four steps,in this order

Call or text, a walk-through and a written price, the build with the owner on site, the final walkthrough.

  1. 01

    Call or text

    Any hour. Tell us what you want to change and where the house is, and we set up a time to see it.

  2. 02

    Walk-through and written price

    We walk the house with you, measure, and put the scope and the price in writing before any work starts.

  3. 03

    Build, supervised daily

    Nareg is on site every day the job runs, checking the work and keeping every trade in order.

  4. 04

    Final walkthrough

    We walk every room with you at the end, and the job is done when you say it is.

Rooms

The roomsthis covers

Rooms like these, from the first wall opened to the last coat. Tell us which one is yours when you call.

  • Interior paint
  • Living room
  • Exterior
  • Stucco

Questions

Questions wehear most often

Something else on your mind? Call or text (626) 497-6227, any hour.

Do I need a permit to paint my house?

No building permit. Painting is exempt finish work under the state code and Pasadena's list, though Pasadena notes some exempt work can still need a zoning permit.

Can I pick any color in a Pasadena landmark district?

Yes. Paint colors are exempt from Certificate of Appropriateness review. An HOA may still have its own rules.

My house was built before 1978. What changes?

Paid work that disturbs more than 6 square feet of paint per room inside, or 20 square feet outside, follows the EPA's lead-safe rule unless the paint tests lead-free. Expect containment, low-dust methods and a thorough cleanup.

What does low-VOC mean here?

In the South Coast air district, nonflat paint can hold no more than 50 grams of VOC per liter under Rule 1113. CALGreen sets the statewide limits.

Can old paint be burned or sanded off?

Not on lead paint. Open-flame burning is prohibited, power sanding needs a shroud and HEPA vacuum, and heat guns stay under 1100°F.

Related services

Often part ofthe same job

Most remodels need more than one of these. One builder runs all of it.

Free estimate

Tell us what you’d liketo build or change

Call or text (626) 497⁠-⁠6227, any hour, or send the short form. We walk the house with you, then put the price in writing.