Kitchen remodeling,built around you

New layouts, cabinets, counters and lighting, built around the way you cook.

Kitchen remodeling

A kitchen runtrade by trade

A kitchen carries more trades than any other room: demolition, framing, plumbing, electrical, drywall, cabinets, counters, tile and paint. We run them in order, and Nareg is on site every day, so the person you call knows exactly where your kitchen stands.

What’s included04 parts

  • Layout first

    Where the sink, range, fridge and island go, settled before anything is ordered.

  • Behind the walls

    Plumbing and electrical moved to the new plan while the walls are open.

  • Cabinets and counters

    Boxes set level and true, counters templated to them.

  • Finishes

    Backsplash tile, lighting, fixtures, trim and paint to close it out.

In depth

How we remodela kitchen

What triggers a permit in Pasadena, the 2025 codes a new kitchen has to meet, what to have ready before the first walk-through, and what moves the cost and the schedule.

What needs a permit in Pasadena

Pasadena's 2025 kitchen handout says you need a permit when the remodel removes, replaces or moves the cabinets and countertops, the sink, the dishwasher or an island, or when it changes the wiring or the range hood. Swapping a countertop or refacing cabinets you keep needs no permit. The permit comes before demolition.

The plans are short: a site plan, a dimensioned floor plan of the kitchen and the rooms beside it, and the existing and proposed layouts if the layout changes. If a wall comes out, the plans show its framing so the city can tell whether it carries load; a bearing wall can call for an engineer. The city inspects at least twice: a rough once the electrical boxes are in, then a final.

In Altadena and other unincorporated areas, LA County Public Works issues the permit through its EPIC-LA portal. The other cities inside our 100-mile area run their own counters on the same state codes.

The codes a new kitchen meets

Permits applied for since January 1, 2026 fall under the 2025 California Building Standards Code: the Residential, Electrical, Mechanical, Plumbing, Energy and Green Building codes. Pasadena adopted all of them, with its own amendments in Title 14 of the municipal code.

The city's checklist for the 2025 California Electrical Code asks for:

  • GFCI-protected, tamper-resistant receptacles at every countertop, within 6 feet of the sink and at the dishwasher.
  • A counter receptacle within 24 inches of any point along the wall, and at least one on an island.
  • At least two 20-amp small-appliance circuits for the counters and walls, and a dedicated circuit for a plug-in range hood.
  • AFCI protection on every 120-volt, 15- and 20-amp kitchen circuit.

If the panel can't carry the new circuits, it gets an upgrade or a subpanel.

Light, air and water

Under the 2025 Energy Code every light you install has to be high efficacy, the lights in and under the cabinets included, and cabinet lighting gets its own switch. Recessed lights must be IC-rated and airtight.

The range hood has to vent outdoors, at least 100 cfm at 3 sones or quieter, through smooth metal duct with a backdraft damper. A HERS rater now verifies the hood unless it moves more than 400 cfm at its lowest speed. Upper cabinets sit at least 30 inches above the cooktop.

CALGreen caps a new kitchen faucet at 1.8 gallons per minute, with a temporary boost to 2.2 allowed. Civil Code 1101.4 reaches past the kitchen: in a single-family home built before 1994, final approval of any permitted alteration requires replacing the noncompliant plumbing fixtures in the whole house. That means toilets over 1.6 gallons per flush, showerheads over 2.5 gallons per minute and faucets over 2.2. Count those fixtures before you set the budget.

Alarms, insulation and older homes

Permitted work brings the alarms up to date. Pasadena's checklist asks for smoke alarms in each bedroom, outside each sleeping area and on each floor, and carbon monoxide alarms when the house has a fuel-burning appliance, a fireplace or an attached garage.

Exterior walls opened during the job get insulation (R-15 in 2x4 walls, R-21 in 2x6), and ceilings opened under the roof get R-22.

If your house was built before 1978, paid work that disturbs painted surfaces falls under the EPA's lead-safe Renovation, Repair and Painting rule unless the paint is shown to be lead-free.

What to have ready, and what moves time and cost

Bring these to the first walk-through:

  • The layout you want, or photos of kitchens you like.
  • Your appliance list with model numbers: hood size, circuits and gas lines follow from it.
  • The year the house was built (1978 and 1994 both matter).
  • HOA rules or historic-district status, if any.

Cost and time move with a few choices: moving the sink, the range or the gas line; opening a bearing wall; a panel upgrade; custom or stock cabinets; stone fabrication; fixture replacements elsewhere in the house; and inspection dates. Clients have told us we're the most affordable and fastest builder they've hired. Nareg Kabaian supervises the job on site every day, and you can call or text him at any hour.

Sources

How a job runs

Four steps,in this order

Call or text, a walk-through and a written price, the build with the owner on site, the final walkthrough.

  1. 01

    Call or text

    Any hour. Tell us what you want to change and where the house is, and we set up a time to see it.

  2. 02

    Walk-through and written price

    We walk the house with you, measure, and put the scope and the price in writing before any work starts.

  3. 03

    Build, supervised daily

    Nareg is on site every day the job runs, checking the work and keeping every trade in order.

  4. 04

    Final walkthrough

    We walk every room with you at the end, and the job is done when you say it is.

Rooms

The roomsthis covers

Rooms like these, from the first wall opened to the last coat. Tell us which one is yours when you call.

  • Kitchen, walnut island
  • Kitchen, marble island
  • Open plan
  • Interior paint

Questions

Questions wehear most often

Something else on your mind? Call or text (626) 497-6227, any hour.

Do I need a permit to replace my countertops?

Not in Pasadena, if that's the whole job. Moving or replacing cabinets, the sink, the dishwasher or the hood does need one.

Does every kitchen outlet need GFCI protection?

Every countertop receptacle does, along with any receptacle within 6 feet of the sink and the dishwasher outlet. Kitchen circuits also need AFCI protection.

Can I use a recirculating range hood?

No. Pasadena's checklist requires a hood vented to the outdoors.

Will I need a new electrical panel?

It depends on your panel. The new circuits and AFCI protection take space and capacity; if the panel can't take them, the city calls for an upgrade or a subpanel.

Why would a kitchen permit change my bathroom fixtures?

Civil Code 1101.4: in a home built before 1994, final approval waits until the old high-flow fixtures in the house are replaced.

Who runs the job day to day?

Nareg Kabaian supervises the work on site every day, and he answers calls and texts around the clock.

Related services

Often part ofthe same job

Most remodels need more than one of these. One builder runs all of it.

Free estimate

Tell us what you’d liketo build or change

Call or text (626) 497⁠-⁠6227, any hour, or send the short form. We walk the house with you, then put the price in writing.