When a bathroom needs a permit
Pasadena's 2025 bathroom handout says you need a permit when the remodel removes, replaces or moves the vanity, the toilet, the sink, the tub or the shower, changes the wiring, or replaces the wallboard. New towel bars, mirrors, paint and floor coverings on their own count as maintenance. The permit comes before the work starts.
The plans are a site plan and a floor plan of the bathroom and the rooms around it, showing the old and new layouts if anything moves. Expect a rough inspection before the walls close and a final at the end.
Permits applied for since January 1, 2026 follow the 2025 California codes. In Altadena and other unincorporated areas, LA County Public Works issues the permit through EPIC-LA.
Showers, tubs and toilets
The plumbing rules set the size and the safety of a shower:
- At least 1,024 square inches of finished floor, wide enough to hold a 30-inch circle.
- A door that swings out, with at least 22 inches clear.
- Walls and floor finished in a nonabsorbent surface up to 6 feet above the floor, the same over a tub-shower.
- A pressure-balance or thermostatic valve, set to a mixed-water maximum of 120°F.
- A site-built shower pan that is watertight, built of dense, nonabsorbent material, with a flanged floor drain.
Under CALGreen a showerhead may flow 1.8 gallons per minute at most, and a shower with more than one head has to stay within that total or run one head at a time. A new toilet uses 1.28 gallons per flush or less, and a bathroom faucet 1.2 gallons per minute. A toilet needs 15 inches from its centerline to each side and 24 inches clear in front.
Glass, light and power
Tempered safety glass goes in every tub and shower enclosure and door. A window also needs it when it sits in a wall around a tub or shower, or within 60 inches of the water's edge, and its bottom edge is less than 60 inches above the floor.
For the wiring, Pasadena's 2025 checklist asks for:
- At least one 20-amp circuit for the bathroom receptacles that serves no other receptacles.
- A GFCI-protected receptacle within 36 inches of each basin, and GFCI protection on every bathroom receptacle.
- No receptacle inside a tub or shower space or over one.
Every light has to be high efficacy, with at least one on a vacancy sensor. No pendant may hang within 3 feet sideways or 8 feet up from a tub rim or shower threshold, and a light inside that zone has to be rated for damp or wet locations.
Getting the moisture out
A bathroom with a tub or shower needs an exhaust fan vented outdoors: at least 50 cfm, or 20 cfm if it runs nonstop. The fan has to be ENERGY STAR rated, quiet (3 sones, or 1 for a nonstop fan) and controlled by a humidistat you can set between 50 and 80 percent humidity. The duct ends outside with a backdraft damper, at least 3 feet from property lines and openings. A half bath with only a toilet and sink can skip the fan if it has an operable window of at least 3 square feet.
New framing stays open until its moisture content is 19 percent or less.
What to have ready, and what moves time and cost
The kitchen rules carry over here. In a home built before 1994, a permit means replacing high-flow fixtures across the house. Smoke and carbon monoxide alarms get brought up to date, opened exterior walls get insulation, and a house built before 1978 falls under the EPA's lead-safe rule when paint gets disturbed.
Bring these to the walk-through: what stays and what moves, tub or shower or both, the tile you like, and the year the house was built. Cost and time follow the drain and toilet locations, a curbless shower, glass, large-format or patterned tile, a window that has to change, and inspection dates. Nareg Kabaian supervises the job on site every day, and you can call or text him at any hour.
Sources
- Residential Bathroom Remodel (2025 codes) City of Pasadena Building & Safety, 2026.
- Codes and Regulations City of Pasadena Permit Center.
- Information Bulletin 25-01: 2025 California Building Standards Code California Building Standards Commission, 2025.
- 2025 California Plumbing Code, 408.7 Shower compartments Title 24, Part 5, via GoCodebook.
- 2025 California Plumbing Code, 408.8 Lining for showers and receptors Title 24, Part 5, via GoCodebook.
- 2025 California Plumbing Code, shower valves Title 24, Part 5, via GoCodebook.
- 2025 CALGreen, Section 4.303 Indoor water use Title 24, Part 11, via GoCodebook.
- 2025 Energy Code, Section 150.0 Mandatory features Title 24, Part 6, via GoCodebook.
- Civil Code Section 1101.4 California Legislative Information.
- I am a homeowner: permits and plan check Los Angeles County Public Works, Building and Safety.
- Renovation, Repair and Painting Program: contractors U.S. Environmental Protection Agency.





