Custom homesand additions

Ground-up homes, room additions and new suites, tied into the lot you own.

Custom homes and additions

Built as one job,from lot to keys

A custom home or an addition is the biggest job a house ever sees: plans, foundation, framing, roof, systems and every finish. We build it as one job from the first walk of the lot to the last walkthrough, with Nareg on site every day it runs.

What’s included04 parts

  • The lot first

    We walk the property and look at what it allows before anything is drawn.

  • Foundation and frame

    The part every finish depends on, built to the plans.

  • Tied into the house

    New roof lines, floors and walls joined to what’s already there.

  • Finished as one job

    Systems, finishes and the final walkthrough, run by one builder.

In depth

Building a customhome or an addition

Zoning, hillside and historic review in Pasadena, ADU law as it stands in 2026, what the 2025 codes ask of a new home, and the fire rebuild rules in Pasadena and Altadena.

Start with the lot

Every new home or addition starts with the zoning code, which sets what can go on the lot: the use, the setbacks, the height, the lot coverage and the floor area.

Two overlays in Pasadena add a step:

  • Hillside. A new home in the Hillside Overlay District needs a Hillside Development Permit. A Hearing Officer decides it after findings on the home's visual and environmental impact. Floor area follows the lot size, shrinks for steep slopes and gets checked against the size of nearby homes.
  • Historic. In a landmark district, new construction, additions and other exterior changes visible from the street need a Certificate of Appropriateness before a building permit.

Pasadena also wants an engineer's soils report for every new home, a second story on a one-story house, a two-story addition, and building or grading in the hillside district.

Additions and ADUs

An addition has to meet the Energy Code for its new space, with some relief: an addition doesn't need its own solar panels, and when the existing system heats and cools it, that equipment doesn't have to meet the current Energy Code. It also brings the alarms up to date, and in a home built before 1994 the old high-flow fixtures get replaced. Pasadena's zoning asks for two covered parking spaces when you add on to a house; landmark districts can waive that.

State law sets the floor for accessory dwelling units (ADUs) in 2026:

  • A detached ADU can be up to 1,200 square feet. A city can't ask for more than 4-foot side and rear setbacks, or block an 800-square-foot ADU.
  • A city has to allow a detached ADU at least 16 feet tall (18 near major transit).
  • With a house already on the lot, the city has 60 days from a complete application to approve or deny it, or it is deemed approved.
  • No owner-occupancy requirement.

Pasadena offers pre-approved ADU plans (built as drawn, no changes) and a virtual consultation with staff before you apply.

What the 2025 codes ask of a new home

The 2025 codes, in force since January 1, 2026, shape a new home's design from the start:

  • Solar. Every new single-family home needs a solar PV system, sized by the home's floor area and climate zone, unless the roof has too little sun.
  • Heat pumps and batteries. The 2025 Energy Code makes a heat pump the baseline for heating in every climate zone and requires new homes to be ready for a battery system.
  • EV charging. A new home with an attached garage gets a raceway and panel space for a 40-amp, 240-volt circuit, marked "EV CAPABLE."
  • Fire sprinklers. New one- and two-family homes get an automatic sprinkler system.
  • Wildfire. In a wildland-urban interface area, the home is built to the California Wildland-Urban Interface Code as well as the building code. The state fire marshal maps fire hazard severity zones, and your city has the local map.

Rebuilding after the Eaton Fire

In Pasadena, the Rebuild Ordinance allows a like-for-like home, or like-for-like plus 10 percent or 200 square feet. Owners who lived in a red-tagged home on January 7, 2025 can apply to have most city plan check and permit fees waived. The city also lets fire rebuilds use the 2022 codes instead of the 2025 set.

In Altadena, LA County treats a rebuild as like-for-like when it has the same size, location and use; it can grow by up to 10 percent or 200 square feet, whichever is greater. A larger rebuild follows current zoning, including the Altadena Community Standards District, with a 20-foot minimum front setback. The county issues permits only after both phases of debris removal are done. These rules keep changing, so check them again when you apply.

What to bring, and what moves time and cost

Bring the lot's address or a survey, any drawings, photos of homes you like and a rough list of rooms. Cost and time move with the lot (slope, soils, trees, access), any hillside or historic review, the size, the engineering, your finishes and plan check rounds. Nareg Kabaian supervises the job on site every day, and you can call or text him at any hour.

Sources

How a job runs

Four steps,in this order

Call or text, a walk-through and a written price, the build with the owner on site, the final walkthrough.

  1. 01

    Call or text

    Any hour. Tell us what you want to change and where the house is, and we set up a time to see it.

  2. 02

    Walk-through and written price

    We walk the house with you, measure, and put the scope and the price in writing before any work starts.

  3. 03

    Build, supervised daily

    Nareg is on site every day the job runs, checking the work and keeping every trade in order.

  4. 04

    Final walkthrough

    We walk every room with you at the end, and the job is done when you say it is.

Rooms

The roomsthis covers

Rooms like these, from the first wall opened to the last coat. Tell us which one is yours when you call.

  • Exterior, desert garden
  • Exterior, travertine and stucco
  • Living room
  • Kitchen

Questions

Questions wehear most often

Something else on your mind? Call or text (626) 497-6227, any hour.

Does a new home need solar panels?

Yes. The 2025 Energy Code requires a PV system on every new single-family home, unless the roof gets too little sun. Additions are exempt.

Do I need a soils report for an addition?

In Pasadena, yes for a second story on a one-story house, a two-story addition, or any addition in the hillside district.

How long does the city have to approve an ADU?

With a house already on the lot, 60 days from a complete application. If the city misses that, the application is deemed approved.

Do new homes need fire sprinklers?

Yes. The residential code requires an automatic sprinkler system in new one- and two-family homes. Additions to a house without sprinklers don't trigger them.

Can I rebuild larger after the Eaton Fire?

Like-for-like rules allow up to 10 percent or 200 square feet more. Past that, current zoning applies, and in Altadena that means a 20-foot front setback.

Related services

Often part ofthe same job

Most remodels need more than one of these. One builder runs all of it.

Free estimate

Tell us what you’d liketo build or change

Call or text (626) 497⁠-⁠6227, any hour, or send the short form. We walk the house with you, then put the price in writing.