, home
Bright living room under a vaulted ceiling with an exposed wood beam, a paneled white fireplace wall, pale oak floors and an olive tree

Home remodeling,room by room

Open plans, new floors and rooms that work, across the whole house.

Home remodeling

The whole house,in the right order

A whole-home remodel moves walls, reworks systems and touches every room. We plan the order of the work so the house stays as livable as it can, run every trade from demolition to the last coat of paint, and keep one person on the job every day: the owner.

What’s included04 parts

  • A plan for the order

    Which rooms go first, and how you live in the house meanwhile.

  • Walls and openings

    Walls removed or moved, openings framed for the new plan.

  • Systems updated

    Electrical, plumbing and HVAC work coordinated with the build.

  • Finished rooms

    Floors, drywall, doors, trim and paint, room by room.

In depth

How we run ahome remodel

Structural changes, what an older or historic Pasadena house brings with it, the alarms and energy rules that come with a permit, and what to settle before the walls open.

One builder on site, every day

A remodel that reaches several rooms brings most trades into the house at once: demolition, framing, plumbing, electrical, heating and cooling, drywall, flooring, tile and paint. Most of the trouble on these jobs starts in the handoffs between them.

Nareg Kabaian supervises the job on site every day, so the sequence, the open questions and the inspections all sit with one person. You can call or text him at any hour. We don't sign a contract and then disappear.

When a remodel becomes structural

The 2025 California Residential Code lets some repairs go ahead without a permit, but it excludes cutting away a wall, removing a beam or a load-bearing support, and moving piping or wiring. Those need a permit. When part of a house goes beyond the code's conventional wood framing, the building official requires that part to be designed and stamped by a California licensed architect or engineer.

Pasadena asks for the existing framing on the plans whenever a wall comes out, so plan check can tell whether it carries load; a bearing wall can call for engineering. New beams often need new posts and footings, so a structural change can reach down to the foundation. A second story on a one-story house, or a two-story addition, also needs a soils report in Pasadena.

What an older house brings with it

  • Lead paint. In homes built before 1978, the EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint, unless the paint is shown to be lead-free. Small jobs (6 square feet or less per room inside, 20 outside) are exempt, but window replacement and demolition of painted surfaces are always covered.
  • Plumbing fixtures. In a single-family home built before 1994, Civil Code 1101.4 makes replacing the noncompliant toilets, showerheads and faucets across the house a condition of final approval.
  • Insulation. Pasadena's checklists ask for insulation in exterior walls opened during the job (R-15 in 2x4 walls, R-21 in 2x6) and R-22 in ceilings opened under the roof.
  • Fire sprinklers. The code doesn't require sprinklers for additions or alterations to a home that doesn't already have them.

Historic districts in Pasadena

Pasadena has city landmarks and landmark districts. In a landmark district, demolition, exterior changes visible from the street and new construction need a Certificate of Appropriateness before the city issues a building permit. City staff review minor projects and the Historic Preservation Commission reviews major ones, both against the Secretary of the Interior's Standards for Rehabilitation. Window replacements, front porches, additions, fences and new garages come up often.

Interior alterations, exterior work out of sight from the street, paint colors, landscaping, solar panels and routine maintenance are exempt. The city says staff review takes about 4 to 6 weeks, Commission review 6 to 8, and a certificate delays a building permit by about two months. Designated buildings can use the State Historical Building Code, which lets some older conditions stay, such as a porch railing below today's height. In Altadena, LA County lists landmarks, eligible properties and a pending historic district.

Alarms, and what to settle first

Any alteration that needs a permit means smoke alarms wherever a new home would have them. Carbon monoxide alarms go in when the house has a fuel-burning appliance, a fireplace or an attached garage, or when you add one.

Before the first walk-through, it helps to know:

  • Which rooms matter most, and what you'd change in each.
  • The year the house was built, and whether it's a landmark or in a landmark district (the city's historic resources database shows it).
  • Any HOA rules on exterior work.
  • Whether you'll live in the house during the work.

What moves time and cost: structural changes and the engineering behind them, historic review, conditions nobody can see until a wall opens (rot, termite damage, old wiring), fixture and alarm upgrades the permit brings, the electrical panel, and how long your selections take to arrive. Clients have told us we're the most affordable and fastest builder they've hired.

Sources

How a job runs

Four steps,in this order

Call or text, a walk-through and a written price, the build with the owner on site, the final walkthrough.

  1. 01

    Call or text

    Any hour. Tell us what you want to change and where the house is, and we set up a time to see it.

  2. 02

    Walk-through and written price

    We walk the house with you, measure, and put the scope and the price in writing before any work starts.

  3. 03

    Build, supervised daily

    Nareg is on site every day the job runs, checking the work and keeping every trade in order.

  4. 04

    Final walkthrough

    We walk every room with you at the end, and the job is done when you say it is.

Rooms

The roomsthis covers

Rooms like these, from the first wall opened to the last coat. Tell us which one is yours when you call.

  • Living room, beamed ceiling
  • Kitchen
  • Living room, garden glass
  • Bathroom

Questions

Questions wehear most often

Something else on your mind? Call or text (626) 497-6227, any hour.

Do I need an engineer to remove a wall?

If the wall carries load, Pasadena can require engineering, and any framing outside the code's conventional rules has to be designed and stamped by a California licensed architect or engineer.

My house is in a Pasadena landmark district. What needs approval?

Demolition, exterior changes visible from the street and new construction need a Certificate of Appropriateness. Interior work and paint colors are exempt.

Does a remodel mean new smoke alarms?

Yes, when the work needs a permit. The house gets smoke alarms where a new home would have them, and carbon monoxide alarms where the code calls for them.

My house was built before 1978. What changes?

Paid work that disturbs paint follows the EPA's lead-safe rule unless the paint is shown to be lead-free: the work area is contained, dust is kept down and the area is cleaned and checked at the end.

Will I have to replace old toilets and showerheads?

In a single-family home built before 1994, yes. Final approval of a permitted alteration depends on it.

Who supervises the work?

Nareg Kabaian, on site every day. He answers calls and texts around the clock.

Related services

Often part ofthe same job

Most remodels need more than one of these. One builder runs all of it.

Free estimate

Tell us what you’d liketo build or change

Call or text (626) 497⁠-⁠6227, any hour, or send the short form. We walk the house with you, then put the price in writing.